Wooldridge Boats
Seattle, Washington
PKJB Architectural Group PS

37,000 square foot warehouse in South Park industrial district in Seattle. The project included a complete build-out, east elevation canopy addition and warehouse structural upgrades and modifications.


    









Talking Rain
Preston, Washington
Lance Mueller Architects

Coordinating the logistics of building a new 100,000 sf warehouse next to a fully operational manufacturing and distribution facility was one of the keys to a successful project. This was accomplished through clear communication and teamwork with critical production schedules and delivery commitments. Another key to success was finding a way to satisfy the county's requirement to test the newly constructed infiltration system for site storm retention. SEA CON responded with a coordinated effort to pump 750,000 gallons of water into the system within a 7-hour period. The success of this test provided both the owner and the county with peace of mind.


  









Northwest Center Commercial Laundry
Kent, Washington


58,000 sf warehouse for the new commercial laundry location which was designed, permitted, constructed and operational in 6 months. This relocation project had over 40 pieces of commercial laundry equipment some in excess of 1,500 pounds. More than 2 miles of piping including steam, detergent, water (clean, recycled and waste) compressed air and natural gas were designed and installed. It also included hundreds of feet of trench drains, two 7,500 gallon sumps and a number of pumps and holding tanks. Failure to meet the deadline would have meant a loss of over 3 million in contracts for Northwest Center.
(
View project documentation)


    









Monterey Gourmet Foods
Kent, Washington
PKJB Architects

60,000 sf tenant improvement to modify transform a large scale printing facility to a fully functional gourmet foods processing and packaging plant.












Liberty Equipment
Seattle, Washington
AHBL Architects

92,000 sf pre-engineered steel building which incorporates concrete tilt-up and two existing buildings. The buildings facilitate metal piping fabrication, warehouse storage and sales. Office space utilizes state-of-the-art adjustable partition walls containing all utilities.
(
View project documentation)


    









Grainger
Bellevue, Washington
PKJB Architectual Group PS

14,000 sf pre-engineered metal building, which houses retail sales, warehouse, office space and mezzanine.
(
View project documentation)


    









Genie Industries
North Bend, Washington
PKJB Architects

27-acre development, 150,000 sf concrete tilt manufacturing and 43,000 sf pre-engineered steel cross dock building


  









Crown Distributing
Arlington, Washington


Located on a 5-acre parcel, this 100,000 sf facility includes 64,000 sf of cool storage for cased beer and kegs and class "A" office space for over 200 employees. The office area also features a banquet room, full kitchen, break rooms, locker rooms, weight rooms, game room and a sports court. This building met or exceeded all of Anheuser-Busch construction standards creating a facility that stands for excellence.
(
View project documentation)


    









Allied Waste
Seattle, Washington
URS

15,000sf metal canopy 100lf steel push wall 12' 60lf steel push wall 5' Concrete replacement currently exceeding 40,000sf @ 15" completed on weekend off hours to allow for minimal downtime


    









↑ Top ↑