Pre-Engineered Steel
Supersonic Practice Facility
Seattle, Washington
Robert E. Baley Construction
Basketball training complex including two courts, weight and conditioning rooms, training room and team offices. This project was completed on an extremely expedited schedule. Design, fabrication and erection of the building shell utilizing a pre-engineered building system.
(View project documentation)
Ronald Wastewater District
Shoreline, Washington
Kubota Kato Chin Inc., PS
The Ronald Wastewater District Storage Facility Addition Project consists of two pre-engineered one-story metal buildings of approximately 2,500 sf and 2,800sf. Site work includes; security fencing, sidewalks, street improvements, landscaping, buried utilites, and storm water detention CMP pipe system, as well as concrete and asphalt paved areas on a vacant 19,000 sf site.
REI Distribution Facility
Sumner, Washington
CNA Architecture Group
One of the largest warehouses under a single roof in the Pacific Northwest, it has a 40ft. eave, high bay warehouse which covers 340,000 sf with additional 120,000 sf of mezzanine and as attached office building of 40,000 sf. Work performed was design, fabrication and erection of the structural and roof systems.
(View project documentation)
FedEx Airplane Hanger
Anchorage, Alaska
747 maintenance hanger that is 260 feet x 260 feet clear span pre-engineered steel building system. Work performed was the design and fabrication of the building shell.
(View project documentation)
↑ Top ↑
Seattle, Washington
Robert E. Baley Construction
Basketball training complex including two courts, weight and conditioning rooms, training room and team offices. This project was completed on an extremely expedited schedule. Design, fabrication and erection of the building shell utilizing a pre-engineered building system.
(View project documentation)
Ronald Wastewater District
Shoreline, Washington
Kubota Kato Chin Inc., PS
The Ronald Wastewater District Storage Facility Addition Project consists of two pre-engineered one-story metal buildings of approximately 2,500 sf and 2,800sf. Site work includes; security fencing, sidewalks, street improvements, landscaping, buried utilites, and storm water detention CMP pipe system, as well as concrete and asphalt paved areas on a vacant 19,000 sf site.
REI Distribution Facility
Sumner, Washington
CNA Architecture Group
One of the largest warehouses under a single roof in the Pacific Northwest, it has a 40ft. eave, high bay warehouse which covers 340,000 sf with additional 120,000 sf of mezzanine and as attached office building of 40,000 sf. Work performed was design, fabrication and erection of the structural and roof systems.
(View project documentation)
FedEx Airplane Hanger
Anchorage, Alaska
747 maintenance hanger that is 260 feet x 260 feet clear span pre-engineered steel building system. Work performed was the design and fabrication of the building shell.
(View project documentation)
↑ Top ↑