Manufacturing/Warehouse


Redhook Ale Breweries
Portsmouth, New Hampshire and Seattle & Woodinville Washington

Multiple projects, each in excess of 135,000 sf. These hybrid pre-engineered metal buildings house fully automated, state of the art brewing facilities; including pub, restaurant, retail sales, and business meeting accommodations.

(View Woodinville project documentation)
(View Seattle project documentation)
(View New Hampshire project documentation)

     


Talking Rain
Preston, Washington

SEA CON LLC’s ability to coordinate the logistics of building a 100,000 sf warehouse next to an operational manufacturing and distribution facility was one of the key components of this successful project.  SEA CON LLC accomplished this through clear communication and teamwork with critical production schedules and delivery commitments. Another key to success was finding a way to satisfy the county's requirement to test the newly constructed infiltration system for site storm retention. SEA CON LLC responded with a coordinated effort to pump 750,000 gallons of water into the system within a 7-hour period.

  


Northwest Center Commercial Laundry
Kent, Washington

58,000 sf warehouse for the new commercial laundry location which was designed, permitted, constructed and operational in 6 months. This relocation project had over 40 pieces of commercial laundry equipment, some in excess of 1,500 pounds.  More than 2 miles of piping, including steam, detergent, water (clean, recycled and waste) compressed air and natural gas were designed and installed. It also included hundreds of feet of trench drains, two 7,500 gallon sumps and a number of pumps and holding tanks. Failure to meet the deadline would have meant a loss of over 3 million in contracts for Northwest Center. (View project documentation)

    


Monterey Gourmet Foods
Kent, Washington

60,000 sf tenant improvement to modify and transform a large scale printing facility to a fully functional gourmet foods processing and packaging plant.


Liberty Equipment
Seattle, Washington

92,000 sf pre-engineered steel building which incorporated concrete tilt-up and two existing buildings. The buildings facilitate metal piping fabrication, warehouse storage and sales. Office space utilizes state-of-the-art adjustable partition walls containing all utilities. (View project documentation)

    
 

Grainger
Bellevue, Washington

A 14,000 sf pre-engineered metal building which houses retail sales, warehouse, office space and a mezzanine. (View project documentation)

    


Genie Terex Industries
North Bend, Washington

27-acre development, consisting of a 150,000 sf concrete tilt manufacturing and 43,000 sf pre-engineered steel cross dock building. (View project documentation)


  


Crown Distributing
Arlington, Washington

Located on a 5-acre parcel, this 100,000 sf facility includes 64,000 sf of cool storage for cased beer and kegs and class "A" office space for over 200 employees. The office area features a banquet room, full kitchen, break rooms, locker rooms, weight rooms, game room and a sports court. This building met or exceeded all of Anheuser-Busch construction standards creating a facility that stands for excellence. (View project documentation)

     


REI Distribution Facility
Sumner, Washington

One of the largest warehouses under a single roof in the Pacific Northwest, it has a 40 ft. eave, high bay warehouse which covers 340,000 sf with additional 120,000 sf of mezzanine and as attached office building of 40,000 sf. Work performed was design, fabrication and erection of the structural and roof systems. (View project documentation)


Paragon
Washington and Idaho

 


American Boiler Works
Arlington, Washington

American Boiler Works was forced to relocate by the Port of Everett to Arlington, WA.  SEA CON LLC provided relocation services and were chosen by American Boiler Works to construct the 3-phased project at their facility in Arlington WA.  Phase 1 consisted of adding two shed roof, pre-engineered steel "wings" onto the existing metal building while American Boiler Works continued business operations.  Phase 2 was the installation and remodeling of (2) 5,000 sf modular offices.  Phase 3 saw the construction of a new, 10,000 sf, concrete tilt and structural steel manufacturing building.  Work included (2) 70 ton Bridge Cranes, (16) fully piped welding stations, office TI's, a new storm retention system and a clean room.


Pacific Rendering
Seattle, Washington

SEA CON LLC constructed a new 28,000 sf facility utilizing concrete tilt-up and pre-engineered steel structural system to accommodate indoor truck storage, food scrap processing equipment shipping/receiving, vehicle maintenance, and office space. The entire facility was constructed to maintain negative pressure to meet PSAPQA air quality requirements. (View project documentation)


Tolt Machine Works
Carnation, Washington

30,000 sf TI modification of an existing metal building to suit a large scale Machine Shop. Major building modifications and custom designs to fit unique equipment